| E22 NOW OPEN |
|
The E22 comprises of six (6) interchanges, four (4) toll plazas and two (2) rest & service areas. The E22 also features a 1.7km Single Plane Cable-Stayed Bridge across Sg. Johor. The bridge will be one of the longest Single Plane Cable-Stayed Bridge in the world featuring 500m main span. The opening of the E22 will be separated into two (2) phases. Phase 1 already opened effective from 10th September 2009. The length of Phase 1 of the E22 is approximately 50km, stretching from Senai to Cahaya Baru with a connection to Pasir Gudang. The E22 Phase 1 opening includes five (5) interchanges; (Utama Senai Interchange, Bandar Senai Interchange, Ulu Tiram Interchange, Cahaya Baru Interchange and Pasir Gudang Interchange) and two (2) Rest & Service Areas. The E22 Phase has been completed and pending government approval to open the expressway to the public. The Phase 2 is approximately 27km in length stretching from Cahaya Baru to Desaru, it includes the Single Plane Cable-Stayed Bridge across Sg Johor and ends at the Penawar Interchange. |
| Home |
| About Us |
| Services |
| Driver's Guide |
| Tourism |
| Environment |
| News |
| FAQs |